Technical Leader - Testing

Technical Leader - Testing

Oloop Technology Solutions Private Limited
India
5 - 8 Years
Not Specified

Job Description


Job Description :
Overview Below are the requirements.
1) Plan to get this through ODC:-
a. Lab space to support the following HW needs (all supplied by Intel WHQL team):VPG
- space to support 80 test client machines (appropriate rack space, cooling, Lab security)
- start with 30 for ramping but 80-100 is estimated final total
- 10 HLK controllers for testing
- 2 infrastructure machines
- Network
- 1 external internet connection for DRM test license provisioning
- Always on Lan ports for all test clients, controllers, etc
- Network needs to support DHCP, WINS, and DNS
- An Intel VPN connection is also required (50Mb connection minimum needed for file transfers, etc)
- Many files are 5-6Gb in
2) Billing & SOW
- Need accountability for late billing submission - have a certain % penalty applied for late billing
4) Extended work hours to overlap FM(USA) workday hours
5) Headcount estimates (based on Legacy programs only for now at ODC):
- 5 execution technicians.
Nice to have items:
1. Vendor already has existing Legacy platforms that can be shared across Validation and WHQL execution
2. Existing experience with WHQL & HLK process
3. Experience with Intel bug mgmt systems (HSD-ES, Jira, etc)
4. Test failure Triage
5. 24 hour support/coverage
6. Pre-built lab that is already equipped with racks, network, security, etc.

Similar Jobs

People Also Considered

Career Advice to Find Better